Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing

Product Details
Customization: Available
Type: Leaching Plant
Voltage: 440V
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Russian
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (14)
  • Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
  • Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
  • Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
  • Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
  • Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
  • Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Find Similar Products
  • Overview
  • More about our machines
  • Company Profile
Overview

Basic Info.

Weight
Varies Based on Capacity
Material
Carbon Steel
Material Feature
Oil Resistant
Certification
ISO9001:2000, CE
Energy Saving
Energy Saving
Warranty
2 Years
Color
Customize Based on Customers′ Local Condition
Customized
Customized
Condition
New
After-sales Service
We Can Send Engineer for Installation and Training
Transport Package
Standard Container and Box
Specification
50~1000 TPD
Trademark
FTL
Origin
China
HS Code
8474209000

Product Description

 200tpd gold All mud cyanide concentrating plant with leaching tank filter press
 
Gold All mud cyanide processing plant
Gold All mud cyanide leaching plant 
        We are professional manufacturer, with rich experienced engineer to design and produce small to medium scale Gold concentrating production line, including Merrill Crowe Zinc Precipitation Plants for the recovery of gold and silver, Gold CIP / CIL plant, gold ore flotation processing plant, All mud cyanide leaching Plant, gold heap leaching plant, and other processing technology according to different ores.

     
     The all mud cyanide process is a process of adding activated carbon to the slurry and simultaneously leaching and adsorbing gold. Including: preparation of leaching slurry, leaching and adsorption, recycling of gold removal carbon, slurry stirring, and desorption of gold loaded carbon.
Application field: Suitable for high-grade large-scale gold ore beneficiation and gold mines with high associated silver and copper content


 

Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
1.Preparation of leaching slurry
       Greatly reduce the number of immersion tanks; Shorten the cyanide operation time, reduce the accumulation of funds in the retention process of gold, quickly withdraw gold, and recover funds quickly.

2..Leaching and adsorption
      The coconut shell activated carbon specially made by FTL Machinery has the characteristics of small pores, high activity, wear resistance, and renewability, and its adsorption rate increases by 30%. De gold carbon recycling effectively reduces carbon wear on the continuous pumping and vibrating screen surface of the slurry, lowers costs, and facilitates maintenance operations.
3..Slurry mixing
    Quickly transport the slurry and perform small circulation of the slurry; Reduce electricity consumption by 70%; Uniform suspension of solid materials; Activated carbon has minimal wear and tear; High gold recovery rate
4..Gold loaded carbon desorption
     By using the FTL Machinery high-temperature and high-pressure desorption method (150 ºC, 0.5Mpa), 99% of the gold can be resolved within 2-6 hours; The concentration of gold and silver cyanide complex ions in the precious liquid is relatively high, while the impurity ions are relatively low. Through the FTL Machinery integrated high-efficiency, low consumption, and fast analysis electrolysis system, high-purity solid gold can be safely and economically obtained





General production Equipment:
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Crushing, Screening Process
The raw ore is fed into the primary crusher by a vibrating feeder, and then into the secondary crusher by a belt conveyor. The crushed ore is sent to the vibrating screen for sorting, the ore under the screen is sent to the powder silo, and the ore above the screen is sent to the third crusher by a belt conveyor for re-crushing. The crushed ore is then sent to the screening machine for sorting, which is a three-stage one-closed-loop crushing flow chart.
 
 
Grinding, Classification Process
The raw material from the powder silo is sent to the first ball mill through the feeder and belt conveyor. The ball mill discharges to the spiral classifier, and the slurry with larger particle size is returned for re-grinding. The overflow is pumped to the hydrocyclone for the second classifier, and the slurry with larger particle size enters the second ball mill, and the discharge returns to the second classifier. This is a two-step two-closed-loop grinding flow chart. The overflow of the
hydrocyclone is sent to the slag screen and thickener.

 
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing


 
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Concentration
After dewatering and thickening by thickener, overflow pulp density of the classifier will be adjusted to the required concentration of the leaching reaction (40%), and to ensure uniform leaching process, continuous feeding.

 
 
Leaching And Adsorption
Concentrated pulp by thickener fed to the leaching tank by slurry pump, adding sodium cyanide stirred 20-24 hours. Gold with cyanide to form gold cyanide complexes, gold-cyanide complex is adsorpted by activated carbon, gold loaded carbon is formed, when carbon reaches a certain grade gold, with air lifter gold loaded carbon will mention to carbon lifting sieve to dewatering, and transported to desorption electrolysis systems by pump.

 
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Desorption And Electrowinning
Desorption solution through heating delivered to the analytical column which loaded gold loader carbon, the desorption column will be temperatured, pressured, the gold precipitated from carbon. After desorbed, the bare carbon returned to the leach adsorption section.
After desorption, the gold contained pregnant solution come into electrowinning cell, get gold powder, electrolysis lean solution
can be returned for elution.

 
 
Different capacity of  Desorption electrolysis system equipment:

Model

Suitable size

Operating parameter

Mine scale(t/d)

Crudes quality(g/t)

GKJD-200

<150

2--8

Temperature:150±2OC

(Na0H)PH:≥13.5

Desorption pressure tank:0.5(Mpa)

Electrolytic tank pressure:0.45(Mpa)

GKJD-300

150-300

2--8

GKJD-500

300-500

2--8

GKJD-700

300-500

2--8

GKJD-1000

500-1000

2--8

GKJD-1500

500-1000

2--8

GKJD-2000

1000-2000

2--20

GKJD-2500

1000-2000

2--20

GKJD-3000

1000-2000

2--20

GKJD-3500

2000-3000

2--20

GKJD-4000

2000-3000

2--20

GKJD-5000

2000-3000

2--20

GKJD-8000

3000-5000

2--20

 
More about our machines

What's more, We also produce and supply all kinds of crushing equipments and mineral processing equipments, including jaw crusher, cone crusher, impact crusher, vibrating feeder, vibrating screen, ball mill, rod mill, stone washer, belt conveyor, screw classifier, flotation machine, magnetic ore separator, shaking table, spiral chute, leaching tank, thickener, rotary kiln, rotary dryer, frame filter press, ect. If you have any interest in our products, Please do not hesitate to contact with us for more details!  

Main Equipment used in the ore processing plant
 

Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
 
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing

 

  
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
 
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing
Company Profile

Professional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor ProcessingProfessional Complete All Mud Cyanide Gold Leaching Plant with Shaking Table Filter Press Air Compressor Processing

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier